Who handles building control in Basingstoke?
If you are extending, converting a loft or turning a garage into living space anywhere in the borough — Basingstoke itself, Tadley, Whitchurch, Overton, Kingsclere, Oakley or Chineham — the local authority building control service is run by Basingstoke and Deane Borough Council's Building Control team. The council asks to be notified before any building work is carried out.
You can also choose a private provider. GOV.UK confirms that for ordinary domestic work you can use either your local authority's building control department or a private registered building control approver. Both check the work against the Building Regulations 2010; the difference is who you appoint, how they run their process and what they charge.
Some smaller jobs are self-certified instead. If an installer is registered with a competent person scheme, you do not need to get approval for that element of the work yourself.
Building Regulations and planning permission are two separate approvals
Planning permission deals with what you build: its size, position and appearance. Building Regulations deal with how it is built: structure, fire safety, insulation, ventilation, drainage and safe stairs. GOV.UK is clear that the two are different and that you might need both.
This is where many Basingstoke homeowners get caught out. A rear extension or loft conversion built under permitted development needs no planning application, but it still needs Building Regulations approval. Our guide to Building Regulations for Hampshire extensions explains the technical requirements in more detail, and our Basingstoke local guide covers the planning side.
Full plans or Building Notice: the two routes in Basingstoke and Deane
Basingstoke and Deane offers two ways to apply for domestic work.
| Full plans | Building Notice | |
|---|---|---|
| What you submit | Two sets of detailed drawings with a full plans application form | A Building Notice form with a site plan |
| When | Before work starts, allowing time for the council's check | At least two days before work starts |
| Council decision | Approve or reject within five weeks of receipt, or two months if agreed with you | No plan approval is issued; the work is inspected on site for compliance |
| Well suited to | Larger or more complex schemes where you want drawings approved in advance | Straightforward domestic projects with a builder who knows the regulations |
With full plans, the council checks your drawings before you build. Provided the work follows the approved plans, you have that assurance from the outset. Inspection charges are invoiced once work starts on site.
With a Building Notice, the emphasis is on site control: the council inspects the work as it goes up rather than approving plans first. It is a quick way to get a typical extension started, and it works best when your builder has a clear, well-detailed drawing set and structural calculations to build from.
Both routes can be submitted directly to the council or online through the Planning Portal.
Which projects can use a Building Notice in Basingstoke?
The council lists the domestic work a Building Notice can be used for. It includes:
- extension of a dwelling with a total floor area up to 100m²
- rooms in the roof space (loft conversions)
- garage conversions
- erection or extension of a detached garage up to 60m²
- alterations to or creation of a basement up to 100m²
- internal alterations, and replacement glazed windows or doors
That list covers the single-storey and two-storey extensions, loft conversions and garage conversions most Basingstoke families are planning. If a project falls outside it, the council asks you to contact the Building Control team directly. Full details are on the council's apply for building regulations approval page.
Inspections and your Completion Certificate
Once work starts, you or your builder must notify Building Control at the agreed stages so the work can be inspected. Basingstoke and Deane lets you book site inspections online.
When the job is finished, a member of the Building Control team makes a final visit. If they are satisfied, the council issues a Completion Certificate, which it says you should receive within two weeks of completing the work.
Keep that certificate safe. The council notes you will be asked for a copy when you sell, and GOV.UK points out that without approval you will not have the certificates of compliance you may need to sell your home. For a practical run-through of what inspectors look at, read our checklist for passing Building Regulations first time.
What if work has already started?
If building work has started or finished without a full plans application or Building Notice, Basingstoke and Deane offers a regularisation application for retrospective approval. The council may ask for critical areas of construction to be exposed and for calculations, and may ask for alterations before it issues a regularisation certificate.
Notifying the council before you start is far simpler. GOV.UK notes that the person doing the work could be prosecuted and fined for not complying with Building Regulations, and the building control body could make you pay to fix faulty work.
Building control fees in Basingstoke and Deane
The council publishes a schedule of Building Control charges, with the current schedule applying from 1 April 2026. Fees depend on the type and size of work and are subject to VAT, apart from regularisation fees. Work that provides a disabled person with a means of access into or out of an existing building, or facilities for their health, safety, welfare or convenience, can qualify for exemption from the application fee. Check the latest schedule on the council's website when you are ready to submit.
How Hampshire Build prepares your Building Regulations drawings
Hampshire Build is a Hampshire architectural design practice with 20+ years in residential design and a 95% planning approval rate. Every package includes Building Regulations drawings prepared for Building Notice submission, with structural calculations from an independent qualified structural engineer, so your builder has a clear, coordinated set of drawings to price and build from.
Our Premium Plus package goes one step further and includes serving the Building Notice for you, so the paperwork is handled alongside the design. See how we work with homeowners across the borough on our Basingstoke page.
How much will your extension cost? Get an initial view of your project's cost and planning position in a few minutes.
Book your free design consultation to talk through your Basingstoke extension, loft or garage conversion.
Frequently asked questions
Basingstoke and Deane Borough Council's Building Control team provides the local authority service across the borough, including Tadley, Whitchurch, Overton and Kingsclere. You can also appoint a private registered building control approver instead.
Yes. Permitted development only removes the need for a planning application. Building Regulations are a separate approval, and extensions, loft conversions and garage conversions still need it.
Basingstoke and Deane says it will approve or reject a full plans application within five weeks of receipt, or within two months if agreed with you.
Basingstoke and Deane asks for the Building Notice form, with a site plan, at least two days before work starts. The work is then inspected on site as it progresses.
Yes. The council's list of work suitable for a Building Notice includes rooms in the roof space, garage conversions and extensions of a dwelling up to 100m² total floor area.
You can apply to Basingstoke and Deane for retrospective approval through a regularisation application. The council may ask for parts of the construction to be exposed, for calculations, or for alterations before issuing a regularisation certificate.