1 — Deposit
£250 + VAT On instruction (books the measured survey).
Contract, notices and build programme
What's included within the Premium Plus Package
Black Friday
Premium Plus
£2,950 + VAT
Save £1,000
£3,950 £2,950 + VAT – Black Friday price
Offer ends 11:59pm Monday 30 November 2026. £250 + VAT deposit required to secure the price. New clients only.
Your package scope
What's included
- Professional on-site measured survey
- Detailed planning drawings
- Planning application submission
- Building regulation drawings prepared for Building Notice submission
- Structural calculations prepared by an independent qualified structural engineer
- Detailed schedule of works
- Contractor vetting and proposal gathering
- Client-focused building contract
- Staged programme of works mapped to contractor payments
- Building Notice submission
- One Party Wall notice to one adjoining owner
Begin with a measured survey
Only £250 + VAT deposit to get goingClear, staged payments
Payment schedule
Three stages, shared across the package options.
2 — Interim payment
£750 + VAT When your design drawings are ready, before they are issued.3 — Balance
Package fee plus agreed add-ons, less payments already made On completion of the design consultation, before amendments and technical drawings.A clear next step
Premium Plus brings together the Pre-Build and Premium documents with a staged programme of works mapped to contractor payments, Building Notice submission and one Party Wall notice to one adjoining owner. These documents help reduce uncertainty around the planned payment stages and included notices. It suits homeowners who want these pre-construction documents brought together in one package.
At a glance
Compare packages in full
Choose a package for a clear scope, then add only what your project needs.
| Package contents | Pre-Build £1,950 + VAT | Premium £2,950 + VAT |
Premium Plus
Current package
Offer ends 11:59pm Monday 30 November 2026. £250 + VAT deposit required to secure the price. New clients only. |
|---|---|---|---|
| Design & planning | |||
| Professional on-site measured survey | |||
| Detailed planning drawings | |||
| Planning application submission | |||
| Building regulation drawings prepared for Building Notice submission | |||
| Structural calculations by an independent qualified structural engineer | |||
| Contract & tender | |||
| Detailed schedule of works | + £500 | ||
| Contractor vetting and proposal gathering | + £500 | ||
| Client-focused building contract | + £500 | ||
| Notices & agreements | |||
| Staged programme of works mapped to contractor payments | + £750 | + £750 | |
| Building Notice submission | + £450 | + £450 | |
| One Party Wall notice to one adjoining owner | + £250 | + £250 |
Still comparing?