Planning Drawings vs Building Regulations Drawings: What's the Difference? (2026)

Quick answer

Planning drawings show the council what your extension or loft conversion will look like, how big it is and how it sits next to your neighbours. Building regulations drawings (often called technical or construction drawings) show how it will actually be built, from the foundations to the roof, so it meets the Building Regulations. Most home extensions need both, and they are produced in that order: planning first, technical second.

Mark Eden, Founder, Hampshire Build
Last updated
7 min
Single-storey rear extension with glazed doors opening onto the garden

Two approvals, two sets of drawings

Most homeowners are surprised to learn that an extension usually needs two separate approvals. Planning permission decides whether you are allowed to build it at all. Building Regulations set the standards for how it is designed and constructed, so the finished building is safe, healthy and energy efficient.

Because the two approvals ask different questions, they need different drawings. Planning officers look at size, appearance and the effect on neighbours. Building Control looks at structure, insulation, fire safety, ventilation and the other technical standards set out in the Approved Documents.

What planning drawings show

Planning drawings describe the proposal. A typical householder set includes:

  • A location plan showing the property in its surroundings, with the site edged in red
  • A block plan (also called a site plan) showing the extension in relation to the boundaries and neighbouring buildings
  • Existing and proposed floor plans
  • Existing and proposed elevations, showing what each side of the house will look like
  • Existing and proposed roof plans, where the roof changes
  • Sections, where heights or levels need explaining

The council uses these to judge the scale, design and materials, and the impact on neighbouring light, outlook and privacy. Our guide to the 45-degree rule explains one of the tests councils apply to these drawings. How the extension will be built is not part of the planning decision, so planning drawings do not need construction detail.

For the full list of what a council expects to receive, see our guide to the drawings you need for a householder planning application.

What building regulations drawings show

Building regulations drawings take the agreed design and explain how it will be built. They are working documents for Building Control and for your builder. A typical set covers:

  • Sections through the extension showing how the walls, floor and roof are put together
  • Construction specification notes covering the foundations, walls, floors, roof, insulation, ventilation and fire safety
  • Structural details and calculations for beams, lintels and other structural elements, prepared by an independent qualified structural engineer
  • For loft conversions, the new stair, the escape route and the floor structure

Their job is to show that the work complies with the Building Regulations. Our guide to what a building regulations drawing package includes goes into each part in more detail.

Side by side

Planning drawings Building regulations drawings
Question answered Can I build it? How will it be built?
Who reads them The council planning officer and your neighbours Building Control and your builder
Focus Size, appearance, materials, impact on neighbours Structure, insulation, fire safety, ventilation, compliance
Typical content Location plan, block plan, floor plans, elevations, roof plans Sections, specification notes, structural details and calculations
When produced First After the design is agreed and approved

Do you need both?

Usually, yes. Even when an extension does not need planning permission because it falls under permitted development, it still has to meet the Building Regulations. Our guide to permitted development or planning permission explains how to tell which route applies, and a Lawful Development Certificate gives you formal confirmation.

Many garage conversions and internal alterations need Building Regulations approval but no planning permission. In those cases the technical drawings do the heavy lifting.

Which comes first?

Planning drawings come first. Technical drawings are best prepared once the planning position is settled, because a council can ask for changes to the design. Producing the construction detail for a scheme that then changes means paying for the same work twice. Building the technical set from the approved design keeps every drawing consistent with what you are allowed to build.

Why your builder needs more than planning drawings

Planning drawings show the outside of the building and the room layout. They do not tell a builder what goes into the walls, how deep the foundations are or what size the steel beam needs to be. Builders asked to price from planning drawings alone have to guess, and guesses turn into extras once work starts.

A full building regulations set gives every builder the same information to price from, so you can compare quotes like for like.

Are construction drawings the same thing?

For a home extension, broadly yes. People use "construction drawings", "technical drawings" and "building regulations drawings" for the same set: the drawings your builder works from on site while Building Control inspects the work.

How Hampshire Build handles both

At Hampshire Build, one team takes your project from measured survey through planning drawings, the planning application and the building regulations drawings, with structural calculations by an independent qualified structural engineer. It is all covered by one fixed fee, so you know the design cost before you start. With 20+ years of residential architectural design experience and a 95% planning approval rate, we design every scheme to get through planning and on to site.

How much will your extension cost? Get an initial view of your project's cost and planning position in a few minutes.

Book your free design consultation to talk through the drawings your project needs.

Frequently asked questions

Planning drawings show what the extension will look like and how it affects the surroundings, so the council can decide whether it can be built. Building regulations drawings show how it will be built, so Building Control can check it meets the Building Regulations.

Usually, yes. Permitted development removes the need for planning permission, but the work must still comply with the Building Regulations.

Only roughly. Planning drawings do not show construction detail, so builders have to make assumptions. A building regulations set lets builders price the same information like for like.

For a home extension, the terms are generally used for the same set of drawings: the building regulations drawings that the builder works from on site.

At Hampshire Build, structural calculations are prepared by an independent qualified structural engineer and included in the building regulations drawings.

How much will your extension cost?